The structure has been completely rebuilt with modern architectural lines and natural materials. It is spread over several floors with indoor and outdoor pools, Kneipp path and hot and cold reaction tanks.
The Thermal structure is spread over a total area of 1200 m² and includes:
- External 5×10 ml tank with laminar cascade
- Kneipp path
- Internal 5×8 ml tank
Three hot/cold reaction tanks